Description: When the maximum load 1980+i956MVA the region, if the grid can guarantee operation at the maximum operating mode, with the ideal maximum power supply capacity, capacity-load ratio of 1.2 a set. 0, the power supply grid cell capacity-load ratio is not balanced, relying on the 110KV tie lines between cells is difficult to achieve a balanced load adjustment.
To Search:
File list (Check if you may need any files):
xiaobofenxi.doc