Description: Power companies generally are not allowed to change the electricity price bidding, but can change the usability of the unit. Therefore, how to organize the unit after obtaining her capacity to generate power, at the same time, and to ensure that the low cost, high efficiency, large gains, is each generation company needs to solve the problem, and the effective method of dynamic planning.
To Search:
File list (Check if you may need any files):
JPYJ_DP_load_dispatch.m
负荷分配