Welcome![Sign In][Sign Up]
Location:
Downloads SourceCode Windows Develop Other
Title: ga_microgrid_dayahead Download
  • Category:
  • Other systems
  • Tags:
  • File Size:
  • 2kb
  • Update:
  • 2019-05-11
  • Downloads:
  • 1 Times
  • Uploaded by:
  • lllj
 Description: Considering the economy of micro-grid generation cost, a day-ahead economic optimal dispatching model with minimal total cost as objective function is established, taking the cost of micro-turbine generation, the cost of energy storage operation and maintenance and the cost of interaction between micro-grid and main network as the total cost of the system, and the constraints of power balance and unit operation as the constraints of the model. Today's optimal dispatching usually takes 24 hours as the dispatching cycle. According to the load and renewable energy output forecast data in the next day's dispatching cycle, the dispatching center of the power grid arranges in advance the output situation of generator units or energy storage equipment in the next day and the amount of electricity to be purchased or sold from the upper power grid in order to achieve the purpose of minimizing the cost of generating electricity or maximizing the revenue.
 Downloaders recently: [More information of uploader lllj]
 To Search:
File list (Check if you may need any files):
FilenameSizeDate
ga_microgrid_dayahead.m 9365 2019-01-17

CodeBus www.codebus.net