Location:
Search - reverse ga
Search list
Description: 游戏反外挂系统NProtect GameGuard版本997的驱动部分源码,由堕落天才兄逆向。研究NP的兄弟不可错过。-game system NProtect GameGuard 997 version of the driving source by the degeneration of genius brother reverse. Research NP brothers not to be missed.
Platform: |
Size: 129024 |
Author: 陈东 |
Hits:
Description: A "code-what"? Unless you have spent some time working in the area of reverse engineering, chances are you have not heard of the term "codecave" before. If you have heard of it, you might not have read a clear definition of it or quite understand what it is or why it is useful. I have even asked seasoned assembly programmers about the term before and most of them had not heard of it. If it is new to you, do not worry, you are not the only one. It is a term that is scarcely used and is only useful in a reverse engineering context. Furthermore, is it "codecave" or "code cave"? I am not quite sure, but I will try my best to refer to it consistently as a "codecave". A space may sneak in there from time to time-A
Platform: |
Size: 123904 |
Author: zllu |
Hits:
Description: 逆向物流GA算法,算法虽然麻烦,复杂,但是还是可以解决问题。-Reverse Logistics GA algorithm, algorithm, although laborious, complex, but can still solve the problem.
Platform: |
Size: 6144 |
Author: chenhua |
Hits:
Description: 针对带有交货期窗口硬约束,并对提前/拖期零件进行惩罚的一类作业车间调度问题,设计了一种改进型遗传算法EGA。交货期窗口硬约束是指每个零件均有交货期和deadline,零件可以在交货期后完工,但绝不能超出deadline。EGA采用“逆向后推”和“顺向前拉”相结合的两阶段求解策略。针对部分染色体在解码过程中违反交货期窗口硬约束而产生非法解的问题,采用基于关键路径的染色体修复方法来调整染色体基因序列,以期实现在满足交货期窗口硬约束的同时降低零件拖期成本;在保持第一调度阶段拖期成本不变的基础上,采用基于逆向重调度的目标值修订方法来延迟零件开工时间,以减小成品提前库存成本。-This paper deals with the job shop scheduling problem with due window to minimize the sum of weighted earliness and weighted tardiness of jobs. This due window is a time duration between the due date and the latest acceptable completion date, namely dealine, of a job. Penalties are incurred if jobs are completed within the due window and the illegal schedule will occur if one job is finished after its deadline. A new Enhanced Genetic Algorithm (EGA), based on a two phase schedule mechanism was introduced. To avoid the violations of due window constraint and simultaneously reduce tardiness costs, a chromosome repair method based on critical paths was designed to adjust chromogene sequence. Then, on keeping tardiness costs unchanged, an objective value revision method based on reverse rescheduling was put forward to delay job release date for reducing earliness costs introduced by each job.
Platform: |
Size: 25600 |
Author: 孙启峰 |
Hits:
Description: 用python写的遗传算法,增加倒序功能-Genetic algorithm written in Python and add reverse function
Platform: |
Size: 4096 |
Author: reon |
Hits: