Description: Simple little program flow calculation, the raw data of the data related to data entry format is as follows: B1 is the slip parameter matrix, the first column and second column is the node number. Node number from small to big with the transformer for the preparation of slip, the first as the low pressure side of the node number, the second as a high-pressure side of the node number, the series impedance of the transformer low voltage side of the deal placed. As the third branch of the serial impedance parameters. Fourth as a slip of the ground admittance parameters. Strong as with the fifth branch of the transformer transformer turns ratio
To Search:
File list (Check if you may need any files):
MATLAB.doc