Description: Scheduling problem in production engineering, logistics is to achieve the manufacturing systems technology, management and optimization technology development of the core The data indicate that the manufacturing process consumes 95 of the time in the non-cutting process effective scheduling and optimization of the research and application of advanced manufacturing technology has become (AMT) the basis of practice and key.
To Search:
File list (Check if you may need any files):
minimize makespan.PDF