Description: Incremental Conductance: In the incremental conductance algorithm, we find the derivative of PV output power
with respect to output voltage. The dP/dV is evaluated and the algorithm keeps checking this value and changes
the duty cycle such that dP/dV=- I/V = 0. This is the point at which maximum power is transferred. If dP/dV is
greater than zero, it means the PV is operating to the left of the MPP. If dP/dV is less than zero, it means the PV is
operating to the right of the MPP. This method holds an advantage over the perturb and observe method since it is
fast and does not oscillate around MPP. However, the method could experience instability due the involvement of
the derivative.
To Search:
File list (Check if you may need any files):
PV_System.mdl
PV_MPPT.mdl