Description:
10 bicycle rental points in demand relevant location and ownership as the basis to establish the cost of dispatching the smallest objective function, take the C programming method for solving the optimal scheduling scheme.
For this scheduling problem, analyze bicycle ownership exceeds or is less than the demand for different rental, and assuming no bike rental points out the lack of scheduling bike, only accept greater than the demand has bicycle rental points transferred, in the definition related constants, initialize the associated data structures, based on using a recursive algorithm for solving the main function makes scheduling cost at least that. First calculate any deployment plan and each multiple car rental points remaining after the deployment of vehicles and numerical calculations based on the minimum rental points remaining to spend, if this cost is greater than the minimum cost records to demonstrate that this allocation is unreasonable, exit redeployment of the ne
To Search:
File list (Check if you may need any files):
新建文本文档.txt