Welcome![Sign In][Sign Up]
Location:
Downloads SourceCode Windows Develop Other
Title: shuyouguandao Download
 Description: An oil pipeline plans to build a problem from east to west from the main pipeline. The pipeline to pass through a field of n wells. From each of the wells must have a pipeline along the shortest path (or south or north) is connected with the main channel. If a given n the location of wells, that is, their x coordinates (east-west) and y coordinates (north-south), how to determine the optimal location of the main channel, even if the oil pipeline to the main road between the sum of the minimum length position? programming tasks: Given n the location of wells, each well programmed to calculate the main channel between the sum of the minimum length of the pipeline.
 Downloaders recently: [More information of uploader 王雪]
 To Search:
File list (Check if you may need any files):
 

shuyouguandao.cpp
    

CodeBus www.codebus.net