- Category:
- GPS develop
- Tags:
-
- File Size:
- 170kb
- Update:
- 2015-11-18
- Downloads:
- 0 Times
- Uploaded by:
- mojtaba
Description: Optimal scheduling problem, assuming that n has a mission by the k-parallel machine to complete the work. I need to complete the mission time for ti. Try to design an algorithm to find n complete this task the best scheduling, making the time to complete a full first mission.
To Search:
File list (Check if you may need any files):
femprb