- Category:
- LabView
- Tags:
-
[LabVIEW]
- File Size:
- 19kb
- Update:
- 2017-07-19
- Downloads:
- 0 Times
- Uploaded by:
- 葉又嘉
Description: t control
An integral term increases action in relation not only to the error but also the time for which it has persisted. So, if applied force is not enough to bring the error to zero, this force will be increased as time pass. A pure "I" controller could bring the error to zero, however, it would be both slow reacting at the start (because action would be small at the beginning, needing time
To Search:
File list (Check if you may need any files):
pid.vi