Description: The assignment is divided into two sub-problems: The first sub-problem is to develop an optimal scheduling plan by simplifying the original manufacturing system through step-by-step thinking. The second sub-problem is formulated by simplifying the idea of integration in the Manufacturing 4.0 manufacturing system Optimal scheduling plan and equipment maintenance plan.
To Search:
File list (Check if you may need any files):
Filename | Size | Date |
---|
ACOSMS_1.m | 6269 | 2017-12-10
|
ACOSMS_2.m | 7104 | 2017-12-10 |