Description: Scheduling in a train station, a track connected to a side rail, the formation of a railway switch stack, as shown below. One wagon left the track for the entrance of the right track for exports, numbered 1,2, ..., n the n-wagon transition from the entrance in order to enter the stack, from room arrangements for scheduling the order of wagon and out of the stack, and a stack wagon according to the order of re- sequence a, a,, an 1 2
To Search:
- [monkey] - The n monkeys in the zoo are numbered 1,
- [Josep] - Josephus with the problem are defined as
File list (Check if you may need any files):