Description: We address the two-stage assembly scheduling problem where there are m machines at the first stage and an assembly machine at the second stage.
To Search:
- [GAbook03] - 3. Genetic Algorithms and Engineering De
- [MATLAB6.5_Optimization] - MATLAB6.5 assisted optimization and desi
- [sa-tsp] - simulated annealing for the shortest pat
- [NetCreate] - The few existing random network topology
- [dqycsf] - Partheno-genetic algorithm optimization
File list (Check if you may need any files):
matlab.doc