Description: City have a focal point 36 of refuse every day from the waste disposal plant (node No. 37) returned from the litter. A current load of 6 tons truck. Each collection point needs to load 10 minutes, average speed of vehicles is 40 km/h (night transport, do not consider the phenomenon of traffic congestion) each car an average of four hours a day. Heavy-duty freight vehicles 1.8 yuan/ton-kilometers garbage truck and loaded the truck with no-load cost of 0.4 yuan/km and the assumption that the streets are parallel to the direction of axes. Please give a satisfactory scheduling of transport, as well as computational procedures.
- [transportproblems.Rar] - LINGO transport problems in the process!
- [up] - Transport of the solution, to resolve th
- [tsp] - For mathematical modeling of a delivery
- [aflow] - Greedy algorithm used to solve aflow hav
- [main] - Ant colony algorithm is the shortest dis
- [EQ] - java DB and java Swing similar database
- [2] - Personal information management system,
- [Chat] - java course design, similar to the qq ch
- [MathematicalModel] - Venus and JIANG Qi Xie editor in chief o
File list (Check if you may need any files):
羊.doc