Description: a code. 2. 1gt test steps; Development board-- inversion; 3gt testing procedures; Serial run monitoring software, 4gt 115,200 baud rate; Using USB cables development board and the PC, if any link, even uprooted re-5GT; The system shows to find new hardware, installation Tools \ usb driver \ drive 6gt D12; running Tools \ UsbDebug.exe 7gt; updated List of equipment, selected items 8gt Philips; endpoints will receive data and send data endpoint set to an endpoint, pipeline size as a 16 if the receiving and sending data endpoint data endpoint Set endpoint 2, pipeline size is zero 9gt 64; press the "start" 10gt; the data sent several data input window, press the "send data" 11gt; At this juncture, data reception window and serial monitoring software should see the data sen
File list (Check if you may need any files):