Welcome![Sign In][Sign Up]
Location:
Downloads Documents Program doc
Title: kumar2015 Download
 Description: In this paper optimal location and capacity of Unified Power Flow Controller to improve the power system stability using hybrid technique composed of ABC-GSA algorithms is proposed. Here, the maximum power loss bus is identified as the most suitable location for connecting the UPFC under generator outage conditions. The optimum location has been determined using the Artificial Bees Colony (ABC) algorithm. Depending on the violated power flow quantities the Gravitational Search Algorithm (GSA) optimize the required capacity of the UPFC to recover the initial stable operating condition. The proposed work is implemented in the MATLAB platform and the performance is analyzed by comparison with individual algorithms ABC and GSA. The comparison results demonstrate the superiority of the proposed Hybrid approach and confirm its potential to solve the problem.
 Downloaders recently: [More information of uploader youcefwx]
 To Search:
File list (Check if you may need any files):
 

kumar2015.pdf
    

CodeBus www.codebus.net