Description: This program is used for "joint optimization of output of multiple thermal power units and energy storage power stations under the guidance of power grid dispatching instructions". The dispatching interval is 1min (modifiable).
To Search:
File list (Check if you may need any files):
Filename | Size | Date |
---|
Joint optimization of thermal power generation and batteries.m | 1869 | 2021-02-07 |