Welcome![Sign In][Sign Up]
Location:
Search - srt-2 algorithm

Search list

[VHDL-FPGA-Verilogdivider

Description: 基于srt-2算法,利用verilog实现16位定点无符号数除法器(除数、被除数均由16位整数和16位小数组成,商由32位整数和16位小数构成,余数由32位小数组成)-Based on the srt-2 algorithm, the use of Verilog to achieve 16-bit unsigned fixed-point divider number (divisor, dividend by 16-bit integer and 16 fractional composition operators from 32-bit integer and 16 fractional composition, the remainder by 32 small array into)
Platform: | Size: 3072 | Author: 刘蒲霞 | Hits:

[Documentssrt-2

Description: 台湾大学电子所讲义,介绍srt-2算法以及更高基的算法-National Taiwan University of Electronics Materials, Introduction srt-2 algorithm, as well as a higher-based algorithms
Platform: | Size: 786432 | Author: 刘蒲霞 | Hits:

[ARM-PowerPC-ColdFire-MIPS5956447divider

Description: 基于srt-2算法,利用verilog实现16位定点无符号数除法器(除数、被除数均由16位整数和16位小数组成,商由32位整数和16位小数构成,余数由32位小数组成)-Based on srt-2 algorithm, using verilog to achieve 16-bit fixed-point unsigned divider (divisor, dividend by 16-bit integer and 16-bit decimal form, business from the 32-bit integer and 16-bit fractional composition, I composed a few from the 32-bit decimal)
Platform: | Size: 3072 | Author: wfwef | Hits:

[OS program4

Description: 模拟进程调度,给出按照算法先来先服务FCFS、轮转RR(q=1)、最短进程优先SPN、最短剩余时间SRT、最高响应比优先HRRN进行调度各进程的完成时间、周转时间、响应比的值。-The simulation process scheduling, given in accordance with the algorithm first-come, first-served FCFS, rotary RR (q = 1), the shortest process priority the SPN, the shortest time remaining SRT, the highest response than the completion time of the scheduling process priority HRRN, turnaround time, response ratio value.
Platform: | Size: 159744 | Author: 高莹 | Hits:

[Algorithmsrt

Description: 两种快速排序算法的实现-Two implementation of quicksort algorithm
Platform: | Size: 1024 | Author: 宋黑 | Hits:

[Linux-Unix5

Description: 进程调度 模拟进程调度,给出按照算法先来先服务FCFS、轮转RR(q=1)、最短进程优先SPN、最短剩余时间SRT、最高响应比优先HRRN进行调度各进程的完成时间、周转时间、响应比的值-Process scheduling simulation process scheduling algorithm is given in accordance with the first-come, first-served FCFS, rotate RR (q = 1), the shortest process priority SPN, the shortest time remaining SRT, the maximum response time than the scheduling priority HRRN be completed for each process, turnaround time, response ratio
Platform: | Size: 2048 | Author: nego | Hits:

CodeBus www.codebus.net