Description: An oil company plans to build a from east to west of the main oil pipeline, this pipeline to pass through n wells of oil fields, oil wells in every through a second pipeline along the shortest path (or South or North) directly connected with the competent Road. Wells on the n distribution of the general location, test to determine the competent Road location, making the well-to-charge of Road to minimize the sum of the length of pipeline. And verify that the linear time can be in charge of Road to determine the optimal location.
To Search:
- [实验报告1 地图着色] - 1. To two-dimensional array list [N+ 1]
- [mtpsampl] - mtpsampl agreement SS7 hardware developm
- [guoqi] - CLIPS is an expert system, it is using t
- [Cpp1] - A data structure of the source, describe
- [guandao.cpp] - An oil company plans to construct a east
- [footballrobot2] - Another robot football program, there ar
File list (Check if you may need any files):